08.02.2006 POSITIONS OF CHARTERED VESSELS

Links under this page

Vessels under Voyage      Vessels under Loading/Discharging      Vessels under Charter

List of Abbreviations

 

 

Other pages under this site

TANOL’S MAIN PAGE | TANOL’S CONTACTS | TANOL’S SAMPLES OF RIDER CLAUSES | TANOL’S PORT DATA MAIN PAGE | TANOL’S VESSEL DATABASE

 

Go to Bottom

 

ALL INFORMATION PORVIDED IS AS BY 08:34 AM HRS GMT OF THE 

Ø

DATE

08 FEBRUARY 2006

 

For historical “Daily Vessel Positions” use below link:

HISTORICAL DAILY VESSEL POSITIONS

 

 

Vessels under Voyage

Vessel Name

Load/Discharge Port

Position

Notes:

OMSKIY 14

AZOV Port, Azov Sea, Russia

One main Black Sea or Marmara Sea or Nemrut Bay or Iskenderun port(s) of Turkey.

Completed loading at AZOV PORT, Azov Sea, Russia on January 20, 2006 at 20:35 PM hrs LT RU.

Presently waiting for Ice-Breaker assistance at AZOV PORT Roads in anchor.

ETS Unknown.

Steel Scrap A3

B/L dd. 20.01.2006 No: (1) for 2741.502 Metric Tons.

Total period of time of waiting under Force Major Conditions:  18 days.

BEVERLY

TEMRYUK Port, Azov Sea, Russia

One main Black Sea or Marmara Sea or Nemrut Bay or Iskenderun port(s) of Turkey.

Completed loading at Temryuk Port, Azov Sea, Russia on January 23, 2006.

Presently waiting for Ice-Breaker assistance at Temryuk Port Roads on anchor.

ETS Unknown.

Steel Scrap A3

B/L dd. 23.01.2006 No: (1) for 2515.020 Metric Tons.

Total period of time of waiting under Force Major Conditions:  15 Days.

Back to Top   List of Abbreviations

 

 

Vessels under Loading / Discharge:

Vessel Name

Load/Discharge Port

Position

Notes:

SAMUR-9

ASTRAKHAN Port, Streletskiy Terminal, Russia.

BANDAR ANZALI Port, I.R. of IRAN.

Arrived Streletsky Terminal – As-trakhan on February 3, 2006 at 01:30 AM hrs LT RU.

Vessel completed loading at February 4, 2006 at 04:00 AM hrs LT RU.

ETA Ice-Breaker: February 8, 2006 WP AGW.

ETA I.R. of Iran unknown, subject to Ice-Breaker Assistance Service.

 

Cargo Loaded:

·    112,700 MTS Net / 125,050 MTS Gross CRC.

B/L dd. 04.02.2006 No: 043.

·    129,960 MTS Net / 131,400 MTS Gross CRC.

B/L dd. 04.02.2006 No: 044

·    262,730 MTS Net / 265,160 MTS Gross CRC.

B/L dd. 04.02.2006 No: 045

 

 

 

 

 

Back to Top   List of Abbreviations

 

Vessel(s) Expected to Arrive Load Port(s) Under our Charter

Vessel Name

Load/Discharge Port

Position

Notes:

 

 

 

 

 

 

 

 

Back to Top   List of Abbreviations

 

 

List of Abbreviations used in this Page:

Abbreviations Related with Voyage:

ETA:      Estimated Time of Arrival

ESL:      Estimated Time of Start of Loading

ESD:      Estimated Time of Completion of Discharge.

ETC:      Estimated Time of Completion

ETS:      Estimated Time of Sail

LP:        Loading Port

DP:        Discharge Port

WP:       By permission of Weather

AGW:    All goes well

POB:     Pilot on Board

 

Abbreviations Related with Time:

LT:     Local Time

ET:     Estimated Time

AM:   From Midnight to Noon Time Zone

PM:   From Noon to Midnight Time Zone

Miscellaneous Abbreviations:

FM:   Force Major

RU, TR, etc: Country Codes

DS:   Draft Survey

 

Back to:   Top    “Vessels under Voyage”  “Vessels under Loading/Discharge”  “Vessels under Charter”

 

Other pages under this site

TANOL’S MAIN PAGE | TANOL’S CONTACTS | TANOL’S SAMPLES OF RIDER CLAUSES | TANOL’S PORT DATA MAIN PAGE | TANOL’S VESSEL DATABASE

 

Contact: info@tanol2000limited.com

Web Master: webmaster@tanol2000limited.com

Last Updated: February 08, 2006 [R. 09]

Data provided by Tanol 2000 Ltd

Designed by IT Department of setNETClub Business Solutions

 

Copyrights © 2004-2006 TANOL 2000 Ltd, All rights reserved